Sl. No. |
YEAR |
CLIENT |
PROJECT & SCOPE OF WORK |
VALUE (AED) |
01 |
2014-2016 |
Abu Dhabi On-Shore Oil Operation Company (ADCO) |
Detailed Engineering, Supply, and Erection & Commissioning support
for the Refurbishment of Pump and Generators as a part of Turbine
Control Upgrade Project. |
1,819,522.00 |
02 |
2014-2015 |
GILBANE – USA/ Afghanistan Ministry of Interior |
Engineering, Supply, Installation and Commissioning of Complete Fuel
Farm System including Control System and Loading-Unloading-Filtration
skids |
7,340,000.00 |
03 |
2011-2012 |
AEGEAN Oil Terminal Co.- Fujairah |
Detailed Engineering Work for Instrumentation & Control Works for
Fuel Oil Tank Farm.</span >Design, Supply, Installation & Commissioning of ESD, MOV & Oil Leak
Detection – PLC & SCADA for Agean Jetty Terminal</span >Design, Supply, Installation & Commissioning of PLC & SCADA System
for Fujairah Port Terminal |
875,000.00 |
04 |
2013-2014 |
Zakum Development Company (ZADCO), Abu Dhabi, UAE |
Erection Testing and Commissioning assistance of Electrical and
Instrumentation work including As-Built Engineering Documentation for
the Water Injection Skids which includes – cable tray, Cabling,
Earthing and Lightning protection system, all type of transmitters,
Switches, Gauges, EJB’s & SJB’s etc.. |
75,000.00 |
05 |
2012-2013 |
Abu Dhabi Gas Liquefaction Company (ADGAS) |
Erection Testing and Commissioning assistance of Electrical and
Instrumentation work including As-Built Engineering Documentation for
the Gas Dehydration Unit (GDU) skid which includes – GRP cable tray,
Cabling, Earthing and Lightning protection system, all type of
transmitters, Switches, Gauges, EJB’s & SJB’s etc.. |
525,000.00 |
06 |
2011-2012 |
Abu Dhabi Oil Refining Company – TAKREER |
Detailed Engineering, Erection, Testing and Commissioning of Flow
Meter and related instrumentation works for sea water pipeline re-vamp
project. |
293,000.00 |
07 |
2013-2014 |
Kuwait National Petroleum Company (KNPC) |
Supply and Installation of E&I works on the 47 No’s of Deluge Valve
Skids supplied from Angus Fire – UK |
275,000.00 |
08 |
2012-2013 |
Abu Dhabi Oil Refining Company – TAKREER |
Installation of EMERSON’s Wireless Vibration Monitoring System for
Sea Water Pumps (12 No’s) including its gateway, server cabinets etc…
at TAKREER GUP Area. |
154,000.00 |
09 |
2012-2013 |
Abu Dhabi Oil Refining Company – TAKREER |
Hydraulic Tube and hose refurbishment, pressure testing and flushing
work for Gangway at Ruwais Jetty |
257,000.00 |
10 |
2013-2014 |
Abu Dhabi Marine Operating Co. – ADMA OPCO |
Total E&I works for four No’s of corrosion inhibitor skids including
Tray work, Cabling, tubing, Instrument Installations,
pre-commissioning & Commissioning Support |
165,000.00 |
11 |
2014-2015 |
Abu Dhabi Polymers Co. Ltd Bourouge, Abu Dhabi, UAE |
Installation and commissioning for Electrical & Instrumentation Work
for the Plant Modification Project – PMP OL 784, PMP OL 594 & PMP
806 |
270,000.00 |
12 |
2015-2016 |
Abu Dhabi Oil Refining Company – TAKREER |
Detailed Engineering, Supply, Erection, Testing and Commissioning
assistance of E&I works for Beeyat Conveyor revamp project including
the Allen Bradley PLC up gradation scope. |
408,000.00 |
13 |
2015-2016 |
Zakum Development Company (ZADCO), Abu Dhabi, UAE |
Supply, Erection ,Testing and Commissioning assistance of
Instrumentation work including As-Built Engineering Documentation for
the provision of DBB valves for NSP/SSP transfer pump suction &
discharge lines which includes – cable tray, Cabling, Earthing,
Tubing , Glanding & termination. |
120,000.00 |
14 |
2015-2016 |
Abu Dhabi Polymers Co. Ltd Bourouge, Abu Dhabi, UAE |
Engineering, Supply, Erection ,Testing and Commissioning assistance
of Instrumentation work for the Acid Metering Skid Package which
includes – cable tray, Cabling, Earthing, Tubing , LCS, JB, Glanding &
termination |
110,000.00 |
15 |
2015-2016 |
OMV (TUNESIEN) GMBH |
Supply, Erection ,Testing and Commissioning assistance of Electrical
& Instrumentation work for NAWARA GAS TREATMENT PLANT Skid Package
which includes – cable tray, Cabling, Earthing, Tubing , LCS, JB, F&G
detectors, Glanding & termination |
950,000.00 |
16 |
2015-2016 |
Abu Dhabi On-Shore Oil Operation Company (ADCO) |
Erection Testing and Commissioning assistance of Electrical work
including As-Built Engineering Documentation for the Mender field
development project Accommodation works which includes – cable tray,
Cabling, Earthing, Lightning, DB,SMDB, LT panel, Street poles &
lighting. |
320,000.00 |
17 |
2015-2016 |
DRAGON OIL (TURKMENISTAN) LTD. |
Erection Testing and Commissioning assistance of Electrical work
including As-Built Engineering Documentation for the Permanent
Offshore Desanding Units which includes – Instruments, cable tray,
Cabling, Earthing, control panel, Glanding & termination |
200,000.00 |
18 |
2016-2017 |
Abu Dhabi Oil Refining Company (TAKREER) |
Erection, Testing and Commissioning assistance of Electrical and
Instrumentation work including As-Built Engineering Documentation for
the IN-TO Plane Area Substation works at Abu Dhabi Airport Expansion
Project which includes –cable tray, Cabling, Earthing, Lighting Poles
and Lightning protection system, all type of transmitters, Switches,
Gauges, EJB’s & SJB’s etc.. |
600,000.00 |
19 |
2016-2017 |
Unliver FZE, Dubai |
Erection, Testing and Commissioning assistance including piping,
electrical, Instrumentation and Automation work for the Solar thermal
project which includes – Piping, Insulation, cable tray, Cabling,
Earthing all type of transmitters, Switches, Gauges, EJB’s & SJB’s
etc.. |
450,000.00 |
20 |
2016-2017 |
Abu Dhabi On-Shore Oil Operation Company (ADCO) |
Erection Testing and Commissioning assistance of Electrical work
including As-Built Engineering Documentation for Wellhead Compression
Pilot Project which includes – cable tray, Cabling, Earthing,
Lightning, DB,SMDB, LT panel, Street poles & lighting. |
730,000.00 |
21 |
2016-2017 |
Emirates Steel Industries (ESI) |
Revamp works for DRP-1 shutdown which includes Supply, erection,
Testing and Commissioning assistance of Electrical & instrumentation
work including cable tray, cables, PA module, lighting, earthing,
field instruments, Junction box etc… |
830,000.00 |
22 |
2017-2018 |
Emirates National Oil Company (ENOC)/ Horizon Terminal – Jabel Ali &
Fujairah |
Two years complete Electrical maintenance contract for Transformer,
LV panels, Earthing, lighting, Pumps etc.. for the Jabel Ali, Fujeirah
terminal and Fujairah port terminal. |
1,900,000.00 |
23 |
2019-2020 |
Emirates National Oil Company (ENOC)/ Horizon Terminal – Jabel Ali &
Fujairah |
Erection Testing and Commissioning assistance of Electrical work
including As-Built Engineering Documentation for the Jet Aviation fuel
depot which includes – Cable tray, Cabling, Earthing, Lightning, DB,
SMDB, LT panel, Street poles & lighting. |
1,800,000.00 |
24 |
2020-2021 |
ADNOC Refining – Ruwais |
Erection, Testing and Commissioning assistance of Electrical and
Instrumentation work including As-Built Engineering Documentation for
the Hydro-cracker and Hydro Skimmer refurbishment work in ADNOC
Refining East incl–cable tray, Cabling, Earthing, Lighting Poles and
Lightning protection system, Control panels and all type of
transmitters, Switches, Gauges, EJB’s & SJB’s etc.. |
2,000,000.00 |
25 |
2020-2022 |
Duqm Refinery, Oman |
Erection, Testing and Commissioning assistance of Electrical work
including As-Built Engineering Documentation for the DUQM refinery
EPC-2 & EPC-1 projects which includes – Electrical & Instrumentation Panels,
Cable Trays, Cabling, Earthing, Lighting Poles, all type of
transmitters, Switches, EJB’s & SJB’s etc.. |
17,000,000.00 |
26 |
2020-2022 |
Abu Dhabi On-Shore Oil Operation Company (ADCO) |
Erection, Testing and Commissioning assistance of Electrical and Instrumentation work including As-Built Engineering Documentation for the RDS9 work –cable tray, Cabling, Earthing, Lighting Poles and Lightning protection system, Control panels and all type of transmitters, Switches, Gauges, EJB’s & SJB’s etc. |
10,300,000.00 |
27 |
2020-2021 |
Ammonia Plant- Salalah, Oman |
Cable laying glanding and Termination works |
1,000,000.00 |
28 |
2022-2023 |
ADNOC Gas Processing (AGP) |
Mechanical, Electrical and Instrumentation works at AGP Habshan as part of the switchgear upgrade project which includes Cable tray, Cabling, Earthing, Lighting Poles and Lightning protection system, Control panels and all type of transmitters, Switches, Gauges, EJB’s & SJB’s etc. |
10,500,000.00 |
29 |
2022-2023 |
Saudi Aramco / L&T MFY, Sohar, Oman |
Electrical, Instrumentation & Telecommunication works for Al Marjan Package-2 for Saudi Aramco which includes Cable tray, Cabling, Earthing, Lighting Poles and Lightning protection system, Control panels and all type of transmitters, Switches, Gauges, EJB’s & SJB’s etc. |
5,200,000.00 |