PROJECTS

ADNOC
Abu Dhabi, UAE

1.0 MMBD- Phase-1 EPC-2 ASSEIFIYA ISLAND Project

Duration: 2026 - Present

Value: 400,000.00

Design, Engineering, Integration & Supply Of Chlorine Analyzer With Sample Handling System & Rack With Sun Shade
FUJAIRAH GOLD
Fujairah, UAE

RECOVERY & LEKHWAIR +20 MBD PROJECT CO ANALYZER SYSTEM

Duration: 2026 - Present

Value: 200,000.00

Design, Engineering, Integration & Supply Of PLC panel, Muffle Furnace, SHS for CO Analyzer
ADNOC
Abu Dhabi, UAE

EPC FOR LOWER ZAKUM HABSHAN UPPER RECOVERY & LEKHWAIR +20 MBD PROJECT

Duration: 2025 - Present

Value: 110,000.00

Design, Engineering, Integration & Supply Of Bubbler Panel.
ADNOC
Abu Dhabi, UAE

EPC WORKS MAXIMIZING ETHANE RECOVERY AND MONETIZATION (MERAM)

Duration: 2025 - Present

Value: 1,000,000.00

Design, Modleing, supply, installation, and commissioning of Predictive Emission Monitoring System (PEMS/SPEMS)
ENOC
Dubai, UAE

SGM ENCLOSURE WITH HEATER AND COOLER

Duration: 2025

Value: 100,000.00

Design, Engineering, Integration & Supply Of Specific Gravity Meter
ADNOC
Abu Dhabi, UAE

EPCM FOR BAB FAR NORTH FULL FIELD DEVELOPMENT

Duration: 2025

Value: 200,000.00

Design, Engineering, Integration & Supply Of Moisture Analyzer With Sample Handling System & 3-Sided Shelter
ADNOC
Abu Dhabi, UAE

1.0 MMBD- Phase-1 EPC-2 ASSEIFIYA ISLAND Project

Duration: 2026 - Present

Value: 400,000.00

Design, Engineering, Integration & Supply Of Chlorine Analyzer With Sample Handling System & Rack With Sun Shade
FUJAIRAH GOLD
Fujairah, UAE

RECOVERY & LEKHWAIR +20 MBD PROJECT CO ANALYZER SYSTEM

Duration: 2026 - Present

Value: 200,000.00

Design, Engineering, Integration & Supply Of PLC panel, Muffle Furnace, SHS for CO Analyzer
ADNOC
Abu Dhabi, UAE

EPC FOR LOWER ZAKUM HABSHAN UPPER RECOVERY & LEKHWAIR +20 MBD PROJECT

Duration: 2025 - Present

Value: 110,000.00

Design, Engineering, Integration & Supply Of Bubbler Panel.
ADNOC
Abu Dhabi, UAE

EPC WORKS MAXIMIZING ETHANE RECOVERY AND MONETIZATION (MERAM)

Duration: 2025 - Present

Value: 1,000,000.00

Design, Modleing, supply, installation, and commissioning of Predictive Emission Monitoring System (PEMS/SPEMS)
ADNOC
Abu Dhabi, UAE

HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT

Duration: 2024 - Present

Value: 12,000,000.00

Construction of Electrical, Instrumentation & Telecommunication works for HABSHAN & BAB TELECOM SYSTEMS UPGRADE PROJECT
ADNOC Onshore
Abu Dhabi, UAE

BAB AIP5 ON PLOT FACILITIES TRAIN-9 PROJECT

Duration: 2024 - Present

Value: 30,000,000.00

Construction of Electrical, Instrumentation & Telecommunication works for BAB AIP5 on plot facilities Train-9 Project
ENOC
Dubai, UAE

SGM ENCLOSURE WITH HEATER AND COOLER

Duration: 2025

Value: 100,000.00

Design, Engineering, Integration & Supply Of Specific Gravity Meter
ADNOC
Abu Dhabi, UAE

EPCM FOR BAB FAR NORTH FULL FIELD DEVELOPMENT

Duration: 2025

Value: 200,000.00

Design, Engineering, Integration & Supply Of Moisture Analyzer With Sample Handling System & 3-Sided Shelter
Saudi Aramco
Saudi Arabia

MARJAN TP-14 & MRJN 740/749 PDM project

Duration: 2023 - 2024

Value: 6,000,000.00

Electrical, Instrumentation and Telecom installation, testing services related works for CRPO-117-E & I scope of work for MARJAN TP-14 & MRJN 740/749 PDM project Saudi Aramco Offshore platform
ADNOC Refining
Abu Dhabi, UAE

Dual Filtration Systems For Nitrogen And Instrument Air At Adnoc Refining

Duration: 2024

Value: 500,000.00

Engineered, supplied, and supported deployment of dual filtration systems for a leading national oil & gas company. System 1 upgraded plant nitrogen to ≥ Grade 5.5 for gas chromatographs, while System 2 provided continuous moisture- and hydrocarbon-free instrument air. The solution reduced cylinder replacements, minimized downtime, and improved analyzer reliability and safety.
ADNOC Onshore
Abu Dhabi, UAE

ADNOC Onshore Epcm Project Swing

Duration: 2024

Value: 300,000.00

Design, Engineering, Integration & Supply Of Dissolved Oxygen Analyzer With Sample Handling System & Rack With Sun Shade
PDO
Oman

PDO Greater Simr Field Development Project

Duration: 2024

Value: 300,000.00

Design, Engineering, Integration & Supply Of H2s Analyzer With Sample Handling System & 3-Sided Shelter